Real Results from Real Projects: Manufacturing Transformation

The Importance of the RFQ Process in Carrier Selection - Real Data Obtained with QCLOT
View Case Study
QCLOT

The Importance of the RFQ Process in Carrier Selection - Real Data Obtained with QCLOT

We demonstrate the importance of a systematic and controlled RFQ (Request for Quotation) process in the logistics activity of a production company, using real data obtained through the QCLOT platform. We emphasize the financial benefits, operational efficiency and risks associated with the lack of competition or absence of this process.

Read Full Case Study
How do you double the storage capacity in 5 days, without downtime or risks?
View Case Study
Consultancy

How do you double the storage capacity in 5 days, without downtime or risks?

After the relocation of the production lines, BCS Timisoara faced a major logistical bottleneck, which jeopardized the continuity of production and compliance with IATF standards. Share it Smart intervened with an integrated solution for operational optimization and rapid reorganization of the warehouse - implemented without interruptions in just 5 days.

Read Full Case Study
How can a shipyard reduce operational equipment costs by more than 500,000 euros in the first year?
View Case Study
ERM

How can a shipyard reduce operational equipment costs by more than 500,000 euros in the first year?

A prestigious shipyard, part of an international group, was facing inefficient resource management, poor planning and the lack of a digital monitoring system. Through an advanced digital solution, Share It Smart has implemented an intelligent planning and optimization system, generating significant cost savings and operational improvements.

Read Full Case Study
Does transporting employees generate high costs and inefficiently allocated resources?
View Case Study
ETPLAN

Does transporting employees generate high costs and inefficiently allocated resources?

A manufacturer in the automotive sector, with over 1000 employees, faced difficulties in managing transport on overtime days. Manual planning and lack of route optimization generated high costs and inefficient use of resources. ET Plan simulation demonstrated that the digitalization of transport can bring major savings and operational efficiency.

Read Full Case Study
How can a company reduce line downtime by 91.2% and improve replenishment through intelligent automation?
View Case Study
Jidoka Kanban

How can a company reduce line downtime by 91.2% and improve replenishment through intelligent automation?

A global automotive parts supplier was experiencing frequent SMT line shutdowns, disorganized inventory, and discrepancies between physical and digital inventory. Share It Smart proposed Jidoka Kanban, an innovative automatic replenishment solution that has transformed material management and increased operational efficiency.

Read Full Case Study
How can a large-scale infrastructure project overcome operational hurdles and increase its productivity by 27%?
View Case Study
Consultancy

How can a large-scale infrastructure project overcome operational hurdles and increase its productivity by 27%?

In an international shipbuilding and road construction context, an ambitious project to build an extended-length bridge faced critical delays, planning deficiencies and a lack of effective organisational alignment. Share It Smart has intervened with an integrated strategy of optimization, digitization and streamlining of production flows, managing to generate significant improvements.

Read Full Case Study