Intelligent Production Scheduling

ProdSYNC
Production Schedules Your Factory Can Trust

Keeps the original plan visible, compares it with live execution, and helps planners decide when to absorb deviations โ€” and when a replan is truly justified.

1
baseline always visible
Live
plan health vs. committed schedule
3
scenarios before any replan
0
black boxes โ€” every decision auditable
Explore Features
Your Challenges

Production plans lose trust before they lose accuracy.

The problem is not that planners do not have data. The problem is that the system does not preserve the original intent of the plan.

The Baseline Disappears

The reference plan is quietly rewritten to match reality. Nobody can say what the original schedule promised or how far execution has drifted.

Deviations Trigger Firefighting

Every delay becomes a manual Excel correction. The system cannot tell a real signal from noise already absorbed elsewhere in the schedule.

Planner Knowledge Isn't Institutionalized

The senior planner knows which lines flex and which suppliers fail on Thursdays. When absent, the shift manager improvises without that context.

Faster Replanning Isn't the Answer

Too much replanning creates schedule nervousness โ€” operators stop believing any schedule will hold and stop following it entirely.

Our Approach

How ProdSYNC Solves It

Not another APS trying to optimize the perfect plan. Realistic scheduling that keeps the original plan honest.

Baseline Truth

Committed Schedule as Permanent Reference

The committed schedule is locked as the permanent reference. Deviations are measured against the original intent, not a moving target that drifts with every update.

Causal Visibility

Root Cause Linked to Every Deviation

Every deviation is linked to its root cause โ€” material delay, capacity gap, supplier miss โ€” and its downstream impact on delivery dates is calculated automatically.

Continuous Sync

ERP Intent Meets Shop-Floor Reality

ERP intent meets shop-floor reality through Jidoka Kanban execution data. Both stay connected to the committed plan. No Excel correction loop needed.

Planner-Controlled AI

Human Oversight as Architecture

AI explains, compares, and surfaces patterns. It never replans autonomously. Human oversight is the architecture โ€” aligned with EU AI Act Article 14 principles.

ProdSYNC is not another APS trying to optimize the perfect plan. It keeps the original schedule visible, connects execution feedback, shows the cause of deviations, and helps planners choose the best trade-off before changing anything.

Feature 01 โ€” Baseline Truth

The Original Plan Stays Visible. Always.

Most systems quietly rewrite the baseline when reality deviates. ProdSYNC locks the committed schedule and keeps it permanently visible โ€” so you always know what was actually promised and by how much reality has drifted.

  • Committed plan locked at approval โ€” never silently overwritten
  • Live execution displayed side-by-side with baseline
  • Deviation delta calculated per line, per order, per shift
  • Planner sees signal vs. noise โ€” not everything needs a replan
Feature 02 โ€” Causal Visibility + Decision Support

Know Why Before You Decide Whether to Act

ProdSYNC links every deviation to its root cause and calculates downstream impact before the planner makes a single decision. Three costed scenarios are presented โ€” absorb, shift, or replan โ€” so the choice is informed, not instinctive.

  • Root cause automatically traced: material, capacity, or supplier
  • Downstream impact calculated before any action is taken
  • Three costed options: absorb, shift, replan
  • Planner confirms โ€” system never acts unilaterally
Feature 03 โ€” AI Layer

AI That Explains and Compares. Never Blindly Decides.

The AI layer builds progressively on a deterministic, auditable constraint-programming core. It explains in plain language, queries the schedule, detects recurring patterns, and generates scenarios for comparison. The planner always decides.

  • Natural language queries: "Why did Line 3 fall behind?" โ€” answered instantly
  • Pattern detection: recurring supplier delays surfaced before they repeat
  • Scenario generation: trade-offs shown, not dictated
  • Aligned with EU AI Act Article 14 human-oversight principles
FAQ

Your Questions About ProdSYNC

Everything you need to know about production schedule intelligence

Ecosystem

ProdSYNC Works With the Products You Already Have

ProdSYNC is the intelligence layer that connects your feasible schedule (MPS) with real-time execution (Jidoka Kanban) โ€” and keeps both honest against the original commitment.

Feasible Schedule Engine

MPS

The constraint-programming optimizer that builds feasible production schedules from ERP orders. The baseline ProdSYNC protects.

Learn More
Real-Time Execution Layer

Jidoka Kanban

Real-time material and production tracking โ€” the live data ProdSYNC uses to measure plan health and detect deviations before they cascade.

Learn More
Get Started

See If ProdSYNC Fits Your Factory

Not a generic demo. A 20-minute diagnostic conversation โ€” your lines, your ERP, your planning pain. We'll tell you honestly whether there's a fit.

Diagnostic Call
20 minutes, no pitch, honest fit check. Your lines, your ERP, your planning pain.
Focused Demo
Tailored to your pain โ€” not a feature tour. See ProdSYNC with your actual scheduling challenges.
Structured Pilot
30-45 days, clear KPIs, before/after measurement. Prove results on one production area first.
Book a 20-min Diagnosticoffice@share-it-smart.com ยท +40 736 909 455